Corfe Wray is a firm of forensic engineers in Sheffield. We find out why buildings, structures and machines failed, and we give expert evidence about it.
We are independent. We design nothing, build nothing and repair nothing, and we have no stake in any company that does.
We are instructed by insurers and loss adjusters, by solicitors acting for claimants and for defendants, by the owners and managing agents of buildings, by manufacturers, and by public bodies.
Founded
2009
People
Fourteen
Investigations since 2009
1,640
Where we work
Across Great Britain and Ireland
Part 1
The eight rules
We publish these rules, in this order, and give a copy with every letter of engagement.
The evidence is logged before anyone forms a view.
Every piece is photographed where it lies, tagged and entered in a register before it is moved.
Our duty is to the court, whoever pays us.
The same report would be written for the other side.
We say what we do not know.
Each report has a section headed “What the evidence does not show”.
Nothing is cut, etched or broken unless every party has been invited to watch.
A destructive test is agreed in a written protocol first.
A cause is not a cause until the alternatives are ruled out, in writing.
Each report lists every other explanation considered and why it was set aside.
We design nothing, build nothing and repair nothing.
We cannot gain from what we find.
The engineer who signs the report is the engineer who went to site.
The fee never depends on the result.
No success fees, no contingent fees, no discounts for a helpful answer.
Part 2
The work
What we investigate most: precast and reinforced concrete, structural steelwork and its connections, façades and glass, cranes and lifting equipment, pressure systems, rotating machinery, and welded and bolted joints.
Five services
Failure investigation.
An engineer attends the site after a collapse, a fracture, a leak, a fire or a breakdown, secures the evidence, and finds the cause.
Materials and fracture examination.
Our own laboratory in Sheffield: optical and scanning electron microscopy, metallographic sections, hardness and tensile testing, and chemical analysis of metals.
Expert witness.
Reports that comply with Part 35 of the Civil Procedure Rules, meetings of experts and joint statements, and oral evidence in court, arbitration and adjudication.
Assessment of damaged and defective buildings.
Car parks, balconies and balustrades, cladding and glazing, roofs, retaining walls: what is wrong, how far it goes, and whether the building is safe to use meanwhile.
Review of another expert’s report.
A written opinion on whether its findings follow from its evidence.
How an instruction goes
A call.
The same working day. What failed, where, and who else is involved.
A conflict check.
Within 24 hours, before anything confidential is discussed.
A letter of engagement.
With a fixed fee for the first stage.
Site.
For an urgent loss an engineer is on site within 48 hours, anywhere in mainland Britain. Evidence is secured, photographed and logged, with a record of who has held each piece.
The laboratory.
Where the failure needs it. The protocol is agreed with the other parties’ experts before any destructive test.
Preliminary findings.
In writing within 10 working days of the site visit. Our average over the last three years is 8 working days.
The full report.
By a date agreed at the start.
If it goes further.
Meetings of experts, a joint statement, and evidence at the hearing.
Fees
A preliminary investigation is £2,850, fixed.
- One site visit
- Examination by eye
- A letter of findings of up to six pages
- Travel in mainland Britain is included
All fees are in pounds sterling and exclude VAT.
The first call and the conflict check are free. A written estimate is given before any stage begins, and no stage begins without the client’s written agreement.
Beyond the preliminary investigation, by the hour
Laboratory work, each
Hearings, and storing evidence
Part 3
The record
Since 2009 we have carried out 1,640 investigations, and our engineers have given oral evidence 212 times.
Preliminary findings reach the client 8 working days after the site visit, on average.
- Over the last three years
- 1,640 investigations since 2009
- Oral evidence given 212 times
Figure 1
Who instructed us, over all 1,640 investigations
Claimants
Defendants
Both sides jointly
As a single joint expert.
Source: Corfe Wray case register, 2009 to 2025.
Figure 2
What we found: the cause of failure, over all 1,640 investigations
Design31%
Workmanship or installation27%
Maintenance19%
A defect in the material or its manufacture14%
Misuse or overload6%
Not determined3%
Source: Corfe Wray case register, 2009 to 2025. Each investigation is counted once, under its principal cause.
Figure 3
What we were asked to investigate, by period
Buildings and structures
Machinery and plant
Products and components
Source: Corfe Wray case register. Shares are of the investigations opened in each period.
Four cases
We never name a client. These four cases are described with the client’s consent.
A floor plank drops in a multi-storey car park.
The Midlands, 2022 · Instructed by the owner’s insurer
A precast concrete plank on level 3 fell 3.2 metres onto the level below. Nobody was hurt.
Finding. A movement joint beside the plank had leaked since about 2011, water carrying de-icing salt reached the corbel the plank sat on, and the corbel’s reinforcement corroded until it had lost 40% of its section. Fourteen more bearings in the same car park were found in the same condition. The car park was propped and reopened in 9 weeks.
The bolts of a tower crane’s slew ring fracture.
Leeds, 2021 · Instructed by the solicitors of the company that hired out the crane
Of the 48 bolts holding the slew ring, 32 had broken. Nobody was hurt.
Finding. Fatigue. The bolts had been tightened to about half the specified preload when the crane was erected.
Glass balustrade panels shatter on a block of 186 flats.
Manchester, 2023 · Instructed by the managing agent
Seven panels broke in eleven months with nothing striking them.
Finding. Nickel sulphide inclusions in the toughened glass. We recommended laminated glass that had been heat-soak tested, and every panel was replaced.
A mixer shaft breaks in a food factory.
Lincolnshire, 2020 · Instructed by the factory’s insurer
The 110 mm shaft of a dough mixer snapped in service and the line stopped for 19 days.
Finding. An earlier weld repair had been made without preheating the steel, and a fatigue crack grew from the edge of the weld. The claim settled before trial.
Figure 4
How one failure developed: the car park, in order
1 · About 2011
The sealant in a movement joint on level 3 fails.
Evidence: maintenance records, and the joint itself.
2
Water carrying de-icing salt runs through the joint onto the corbel below.
Evidence: staining, and salt deposits on the corbel’s face.
3
Chloride at the reinforcement reaches 1.9% by mass of cement, against a threshold of 0.4%.
Evidence: dust samples drilled at four depths.
4
The corbel’s reinforcement corrodes and loses 40% of its section.
Evidence: the bars, measured after the concrete was broken out.
5 · March 2022
The corbel fails in shear with a van parked on the plank.
Evidence: the fracture surface, and the car park’s own cameras.
6
The plank falls 3.2 metres.
Source: Corfe Wray report of July 2022, summarised with the client’s consent.
Their report was the first document in the bundle that the judge said he had read twice.
On the third day they told us our own insured was at fault. It was not what we wanted to hear, and it saved us two years.
Their engineer was on our site for six days, logged every bolt, and never once guessed.
Accreditation and memberships
The laboratory
Accredited by UKAS to ISO/IEC 17025, testing laboratory number 9214
Quality system
Certified to ISO 9001:2015
The principals
Both are Chartered Engineers and members of the Academy of Experts
Professional indemnity
Insurance of £10 million for each claim
Part 4
The people
Fourteen people work here: eleven engineers and metallurgists, and three in the office.
The principals
Helen Corfe, a structural engineer, and Daniel Wray, a mechanical engineer and metallurgist, founded the firm in 2009. They are its two principals and still lead investigations themselves.
Helen Corfe, BEng PhD CEng FIStructE, has given oral evidence 96 times. Daniel Wray, MEng CEng FIMechE, has given oral evidence 78 times.
The people

The principals, in the laboratory
at a failure
Part 5
Instruct us
A new enquiry is answered within one working day. The first call and the conflict check are free.
Or telephone, or write
Telephone
Monday to Friday, 8:30am to 5:30pm
Urgent loss, any hour
Answered by an engineer
Office and laboratory
London, by appointment only
9 Took’s Court, London EC4A 1LB
Consulting rooms for meetings of experts and conferences with counsel
A new enquiry
Answered within one working day
The first call
Free, with the conflict check